Just came today - the range, hood, dishwasher and microwave. We're reusing our refrigerator - it's going to be tricky getting it back in the house though - that sucker was HEAVY!
We had them paint the whole house in one color and will do any accent walls ourselves in the future. Color is a Benjamin Moore paint called White Chocolate.
The concrete has been poured for the laundry room floor. Dugan used concrete instead of gypcrete because we'll be leaving the laundry room floor bare (sealed concrete). We'll be doing gypcrete in the rest of the basement since we'll put some sort of finish on top of it, probably carpet.
Here's Lola in her future room... Or maybe it'll be this one? View from the front - you can see the drywalled ceiling and walls inside. Dugan is currently working the concrete in the basement and has poured the sidewalk concrete (just a minimal area to patch where the porch used to be)
They finished the insulation on Thursday and have been installing drywall all weekend. I'm having problems uploading photos so I will try again tomorrow!
This house was built in 1929 on 6" unreinforced concrete foundation walls and 2x4 walls and rafters. After over 2 years of planning, procrastinating and surprise early arrivals (aka Lola), our house project is under way. We're gutting almost the entire first floor and adding a full second story. The basement is getting some interior drains under the slab as well as a couple new footings and posts to support the new loads.